Scour Protection Works - River Anker, Polesworth
Norfolk Marine Ltd has been awarded the contract to supply and install a cast in-situ concrete fabric formwork system to provide underbridge scour protection. The Geotextile mattress system will be installed and filled in two stages below NetworkRail’s bridge near Polesworth, on the River Anker. The bridge carries 4 tracks on the main line between London’s Euston Station and Lime Street Station in Liverpool.